Ascend Archive
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: (ASCEND) LOTS of c=185
Matt Holdrege <matt@ascend.com> writes:
>
> CCP is the Compression Control Protocol, RFC 1962. I generally recommend
> that you disable link compression both at the Max and on the PC for windows
> modem calls. It often causes problems with windows.
Oh boy, I'd love to disable any kind of compression on the MAX.
However, unless Ascend stops stops tampering with CCP-negotiations
in every other incremental/patch release and makes it a configurable
option, you can only chose between 30 seconds call setup time and
choking connections :-(
--
Manfred Kwiatkowski, ZRZ (Zentraleinrichtung Rechenzentrum), Sekr.: EN 50,
Technische Universitaet Berlin, Einsteinufer 17, D-10587 Berlin, GERMANY.
INTERNET: kwiatkowski@zrz.TU-Berlin.DE phone: +49 30 314 24355
X.400: s=kwiatkowski ou=zrz p=tu-berlin a=d400 c=de fax: +49 30 314 21060
++ Ascend Users Mailing List ++
To unsubscribe: send unsubscribe to ascend-users-request@bungi.com
To get FAQ'd: <http://www.nealis.net/ascend/faq>
Follow-Ups: